After a noticeable decline in pumping capacity and poor water quality, the Village of East Troy had taken Well 6 offline.  Lynch & Associates worked with the Village to provide design and construction services for well rehabilitation that included chemical treatment in conjunction with airburst technology to treat the well. Read More →

Valley View Drive Design, Construction Observation, and Construction Management services were performed on this project. The design of the downstream structure for this project was a customized structure design to diminish turbidity during heavy rain events preventing the existing washout issues which were plaguing the Village in it’s existing condition.Read More →

Design of this project consisted of storm sewer, sanitary, curb & gutter replacement, sump pump tile tie-ins to the existing storm sewer main, drive approaches, and full depth pavement reconstruction as well as updating ADA ramps to current ADA standards. Bidding of the construction project took place in March 2017Read More →