Village of East Troy – Well 6

After a noticeable decline in pumping capacity and poor water quality, the Village of East Troy had taken Well 6 offline.  Lynch & Associates worked with the Village to provide design and construction services for well rehabilitation that included chemical treatment in conjunction with airburst technology to treat the well.  Work included replacement of the existing pump to optimize performance and replacement of valves within the well house.  After completion, the well had an increased specific capacity and acceptable water quality and was placed back into normal operation.